Inquiry
Form loading...
Blog Categories
Featured Blog

Blog

South Africa steel factory medium voltage switchgear item

South Africa steel factory medium voltage switchgear item

2024-04-29

This project is located in Johannesburg, South Africa, with a total of 28 medium pressure cabinets and a production cycle time of 30 days.

view detail
National Grid Corporation of the Philippines(NGCP) Project

National Grid Corporation of the Philippines(NGCP) Project

2024-04-29

NGCP is a privately owned corporation in charge of operating, maintaining, and developing the country's state-owned power grid, an interconnected system that transmits gigawatts of power at thousands of volts from where it is made to where it is needed.

view detail
BOKR ELEC company Wins the Ten kV Distribution Network Project of Hunan Electric Power Company

BOKR ELEC company Wins the Ten kV Distribution Network Project of Hunan Electric Power Company

2024-04-29

After winning the bid for ring cabinet in Hunan market in April this year, BOKR ELEC company. has won the bid for five consecutive years in Hunan from 2013 to 2017.

view detail